← The pathway

Section

Content

Idea to script to shoot to edit to schedule. This is the most involved build on the site and the diagram below is worth reading before the steps.

5 agents in this branch. 3 of them wired to the assistant today. The rest are honest about where they are.

Every one of these assumes steps 2 to 4 of the build are done. Start at Give it a home if they are not.

Idea to posted, and where each stage runsAirtable. Runs anywhere, phone included.Needs the drive. Runs at home only.Idea inTelegram message lands as a rowScriptNine components, worked in a chatShootCamera to the driveTranscribeWhisper, word-level timingsCutDead air and retakes removedComposeRender, captions, coverPush finalsFiles back to the boardScheduleOut to every platform, then measured

Six of the eight stages need the video files, so they run on the machine those files sit on. The two that do not run from a phone. Building this the other way round, with the render on the host, is the mistake that made me rebuild it once.

What is in this branch

Content pipeline

Wired to the assistant

Brief to posts, across every platform

list_content_ideas

Weekly research

Wired to the assistant

Researches the theme, writes the questions, asks them

get_weekly_theme

Formats and shots

Built, not wired

The device library the videos are built from

Clips and b-roll

Built, not wired

Tags the footage so the right shot is findable

Publishing

Wired to the assistant

Posts it, then reports back on what landed

get_post_results get_lead_magnets

I am writing the build guides for this branch

One per agent, in the order above. The three pathway steps are finished and are the part you need first. If you opened those with your email, the rest arrive the same way.

The other branches

Core rebuild

The four things that had to come back first.

Day to day

Running the week without a to-do list.

Business

Finding the work and doing the work.